Free WiFi

Reconstruct Portion of Taxiway B2

Related Document: TW-B2-Reconstruction.pdf

                                        RYAN AIRFIELD

 

RE:   20110092 Reconstruct a Portion of Taxiway B2  

Construction Scheduled to Begin on April 24, 2014

Duration: 34 days

WORK CONSISTS OF:   Reconstruction of southern portion of Taxiway B2 from the entrance of the hanger area complex to the restaurant apron.  Reconstruction involves the milling and removal of existing asphalt pavement and aggregate base, lime treatment of subgrade, install new asphalt pavement and re-stripe.  See attached diagram.

  • South portion of Taxiway B2 will be closed to all aircraft during construction period.
  • Fueling Services available at tower apron from 7 am - 4 pm or by appointment. Call Velocity Air (FBO) 520-744-7474.
  • Aircraft parking available at tower apron or hangar space at Tucson International Airport (TIA).Contact Barbara Hempel at 573-4819 or email bhempel@flytucson.com
  • Transportation available from tower apron to Ryan administration building and Todd's restaurant. Call Velocity Air (FBO) 520-744-7474.
 
       

 Please use Extreme Caution while in the construction area.

PRIMARY PROJECT CONTACT:

 

Routine Project Information:              Dexter De Vera (520-573-8202)

Construction Emergencies (24/7):        Mark Staszak (520-573-8014) OR

Page Via TAA Communications Center (520-573-8182 or 8111)